Approaches to ensuring completeness in estimating

Poor estimates of project duration are rarely down to minor errors in mathematical formulae

The main problems are:

Question: How can we ensure that all activities have been included?

 

 


Two approaches to identifying tasks

Task-based approach

Product-based approach


Task-based approach

WBS

The Work Breakdown Structure is the traditional tool for devising lists of tasks

The WBS can be conceived as a tree, with the project as the root node, major components of the project as the main branches, and tasks/subtasks branch off from these. A WBS may be a diagram or a text list.

It is up to the project manager to ensure that all the tasks are included.

Question: What can we do to ensure the list is complete?

 

 


Example of a textual WBS

33.01 MOBILIZATION AND PREPARATORY WORK

33.01.01 MOBILIZATION OF CONSTRUCTION EQUIP. AND FACILITIES

33.01.02 MOBILIZATION OF PERSONNEL

33.01.03 PRECONSTRUCTION SUBMITTALS/IMPLEMENTATION PLANS

33.01.03.01 Erosion Control Plan

33.01.03.04 Environmental Protection Plan

(etc)

33.01.03.14 Construction Quality Control Plan

33.01.04 SETUP/CONSTRUCT TEMPORARY FACILITIES

(etc)

33.01.05 CONSTRUCT TEMPORARY UTILITIES

33.02 MONITORING, SAMPLING, TESTING, AND ANALYSIS

33.02.03 AIR MONITORING AND SAMPLING

(etc)

33.03 SITE WORK

33.03.04 ROADS/PARKING/CURBS/WALK

33.03.04.03 Aggregate Surfacing

(Source: US Army Corps of Engineers)

See also NNH's description of WBS


 